Scaffold design

Views: 75     Author: Site Editor     Publish Time: 2016-09-23      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Scaffold design

 
It is a requirement of the Work at Height Regulations 2005 that unless a scaffold is assembled to a generally recognised standard configuration, eg NASC Technical Guidance TG20 for tube and fitting scaffolds or similar guidance from manufacturers of system scaffolds, the scaffold should be designed by bespoke calculation, by a competent person, to ensure it will have adequate strength, rigidity and stability while it is erected, used and dismantled.
 
At the start of the planning process, the user should supply relevant information to the scaffold contractor to ensure an accurate and proper design process is followed.  Typically this information should include:
 
site location
period of time the scaffold is required to be in place
intended use
height and length and any critical dimensions which may affect the scaffold
number of boarded lifts
maximum working loads to be imposed and maximum number of people using the scaffold at any one time
type of access onto the scaffold eg staircase, ladder bay, external ladders
whether there is a requirement for sheeting, netting or brickguards
any specific requirements or provisions eg pedestrian walkway, restriction on tie locations, inclusion/provision for mechanical handling plant eg hoist)
nature of the ground conditions or supporting structure
information on the structure/building the scaffold will be erected against together with any relevant dimensions and drawings
any restrictions that may affect the erection, alteration or dismantling process
Prior to installation, the scaffold contractor or scaffold designer can then provide relevant information about the scaffold.  This should include:
 
type of scaffold required (tube & fitting or system)
maximum bay lengths
maximum lift heights
platform boarding arrangement (ie 5 + 2) and the number of boarded lifts that can be used at any one time
safe working load / load class
maximum leg loads
maximum tie spacing both horizontal and vertical and tie duty
details of additional elements such as beamed bridges, fans, loading bays etc, which may be a standard configuration (see note 1 ref TG20:13) or specifically designed
information can be included in relevant drawings if appropriate
any other information relevant to the design, installation or use of the scaffold
reference number, date etc. to enable recording, referencing and checking
All scaffolding must be erected, dismantled and altered in a safe manner.  This is achieved by following the guidance provided by the NASC in document SG4 ‘Preventing falls in scaffolding’ for tube and fitting scaffolds or by following similar guidance provided by the manufacturers of system scaffolding.
 
For scaffolds that fall outside the scope of a generally recognised standard configuration the design must be such that safe erection and dismantling techniques can also be employed throughout the duration of the works. To ensure stability for more complex scaffolds, drawings should be produced and, where necessary, these may need to be supplemented with specific instructions.
 
Any proposed modification or alteration that takes a scaffold outside the scope of a generally recognised standard configuration should be designed by a competent person and proven by calculation.

Related news

content is empty!

Get in Touch

86-25-5712 3616

0086-18606192990

kevin@ekscaffolding.com

Scaffolding Manufacturer

EK Scaffolding

Contact Us

Copyright © 2016 - 2022 EK Metalwork Co.,Ltd. All rights reserved.