Publish Time: 2024-07-10 Origin: Site
EK scaffolding is a metal product processing factory, mainly providing iron and aluminum scaffolding and other building materials. At present, the factory has accumulated rich experience in Base Jack production and upgraded the processing flow of Base Jack. Most of the links will be operated by machines and equipment, which greatly improves the product quality of Base Jack.
Base Jack production process
① Purchase raw materials
② Use thread rolling machine to roll steel pipe
③ Use laser cutting machine to cut Base Jack according to the size of the design drawing
④ Perform external chamfering on Base Jack to make the cut smoother and install nuts more convenient
⑤ Use laser cutting machine to cut Base Plate according to the size requirements and shape on the design drawing
⑥ Stamp Base Plate
⑦ Place Base Jack and bottom plate on automatic welding equipment for welding
⑧ The welded equipment is surface treated as required, including electro-galvanizing, hot-dip galvanizing, spraying and painting
⑨ Install nuts and destroy teeth
⑩ Final quality inspection
⑪ Packing and stacking
⑫ Loading and shipping
In addition to producing Base Screw Jack, EK Scaffolding also provides other building materials. Our Base Jack, Steel Prop and Scaffolding Gate are very advantageous in quality and price. If you need them, we are always here.
Company Profile Certificates FAQ EK VIDEO Scaffolding News Scaffolding Price
Copyright © 2016 - 2022 EK Metalwork Co.,Ltd. All rights reserved.