Name | Pic | Code No. | Adjust Height | Tube&Plate size | Finish |
LIGHT DUTY PROPS | | PSL01 | 1080-1790 | 40/48 48/56 48/60 | Pre-gal Elec-gal HDG Painted |
PSL02 | 1800-3150 | ||||
PSL03 | 1950-3350 | ||||
PSL04 | 2570-3880 | ||||
PSL05 | 3200-4890 | ||||
HEAVY DUTY PROPS | | PSL01 | 1080-1790 | 48/60 | Pre-gal Elec-gal HDG Painted |
PSL02 | 1800-3150 | ||||
PSL03 | 1950-3350 | ||||
PSL04 | 2570-3880 | ||||
PSL05 | 3200-4890 | ||||
HEAVY DUTY PROPS | | PSH01 | 1080-1790 | 63/76 | Elec-gal HDG Painted |
PSH02 | 1800-3150 | ||||
PSH03 | 1950-3350 | ||||
PSH04 | 2570-3880 | ||||
PSH05 | 3200-4890 |
Name | Pic | Code No. | Adjust Height | Tube&Plate size | Finish |
U TYPE HEAD PROPS | | PSU01 | 1600-2900 | 40/48 48/56 | Elec-gal HDG Painted |
PSU02 | 1800-3200 | ||||
PSU03 | 2000-3600 | ||||
PSU04 | 2100-3800 | ||||
PSU05 | 2200-4000 | ||||
T TYPE HEAD PROPS | | PS01 | 1600-2900 | 40/48/60 48/56/60/75 | Elec-gal HDG Painted |
PS02 | 1800-3200 | ||||
PS03 | 2000-3600 | ||||
PS04 | 2100-3800 | ||||
PS05 | 2200-4000 |
STEEL PROP COMPOSITIONIn addition to the difference in diameter and thickness of inner/outer tubes for steel prop, the most important difference is the type of nut, which usually comes in three types. | |
TRIPOD & FORK HEAD EK's scaffolding Tripod is to adjust and support the steel prop. When steel prop are used for concrete and beam formwork, the Tripod serves to stabilize the steel prop. Maximum safety is guaranteed. EK's scaffolding tripod is made of square tube and round tube. Fork Head is also one of the scaffolding products used with steel prop. It is placed on the top of the steel prop, which also plays the role of adjusting the steel prop and fixing the formwork system. We can also customize Tripod and Fork Head for customers according to their requirements. | |
TABLE HEAD Scaffolding table head is a connector used to fix H20 beams on top of scaffolding steel props. The scaffolding table head is fixed and connected to the 4 holes on the H20 beam through bolts and nuts to ensure the firmness of the ground and the table head. The Scaffolding table head only needs to be quickly assembled and disassembled by hammering. | |
Company Profile Certificates FAQ EK VIDEO Scaffolding News Scaffolding Price
Copyright © 2016 - 2022 EK Metalwork Co.,Ltd. All rights reserved.