Frame scaffoldings have different styles such as walk through frame, mason frame, open end frame, step frame, ladder frame, H frame, shoring Frame.
In order to cater clients’ demands in different countries and areas, American type galvanized, pre-galvanized walk-through frame, Mason single and double ladder frame, light weight Italian painted ladder frame, powder coated Korean type steel frame scaffold, etc.
Walk through scaffolding is a frame scaffolding system widely used in North America. Different regions use different styles, mainly differing in the locking mechanism, tubing specifications, and connection methods.
This type of walk through scaffolding allows for easy worker access and is ideal for walkway roofs or situations requiring continuous work along walls. A walk through scaffolding system consists of two frames, two scaffolding cross bracelets, four base jacks, and four joint pin couplers. It can create a work platform to meet various construction needs, improving on-site work efficiency and safety, and shortening setup time.
Walk through scaffolding is made of high quality Q235 steel, with a surface that can be powder coated or hot-dip galvanized, making it sturdy, durable, corrosion-resistant, and rust-proof.
Walk Through Scaffolding Installation Steps
Step 1: Install and level the base jacks.
Step 2: Connect the frames using the scaffolding cross bracelets to ensure the stability of the walk through frame scaffolding.
Step 3: Place the scaffolding plank on the frame scaffolding.
Step 4: Build upwards, adding frames, scaffolding cross braces, and scaffolding planks as needed.
Step 5: Install safety devices, adding handrails, toe boards, and ledgers to all working levels, ensuring compliance with relevant regulations.
Walk Through Scaffolding Size
No. | Description | Width | Height | OD | Surface |
EKF-W01 | Walk through scaffolding | 3’ | 4’ | 1.625” | Pre-gal; HDG; Painted; Powder Coating |
EKF-W02 | Walk through scaffolding | 3’ | 5’ | ||
EKF-W03 | Walk through scaffolding | 3’ | 6’8” | ||
EKF-W04 | Walk through scaffolding | 5’ | 6’8” | ||
EKF-W05 | Walk through scaffolding | 3’ | 5’ | 1.69” | |
EKF-W06 | Walk through scaffolding | 3’ | 6’4” | ||
EKF-W07 | Walk through scaffolding | 42’ | 6’4” | ||
EKF-W08 | Walk through scaffolding | 5’ | 6’4” |
Walk Though Scaffolding Production
Walk Through Scaffolding Test
Company Profile Certificates FAQ EK VIDEO Scaffolding News Scaffolding Price
Copyright © 2016 - 2022 EK Metalwork Co.,Ltd. All rights reserved.