/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
             WeChat:
             Kevin_EK
             E-mail:
             kevin@eksca.com
You are here: Home » Blog » Base Jack » Production of Screw Jack Step by Step

Production of Screw Jack Step by Step

Views: 0     Author: Site Editor     Publish Time: 2024-07-10      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

EK scaffolding is a metal product processing factory, mainly providing iron and aluminum scaffolding and other building materials. At present, the factory has accumulated rich experience in Base Jack production and upgraded the processing flow of Base Jack. Most of the links will be operated by machines and equipment, which greatly improves the product quality of Base Jack.

This is a video showing the production process of base jacks.

base jack


Base Jack production process

① Purchase raw materials

We have a fixed raw material supplier. After the customer places an order, we can purchase steel pipes and steel plates that meet the requirements in a timely manner.

steel pipe steel pipe steel pipe

② Use thread rolling machine to roll steel pipe

The purchased steel pipes will first be inspected by professionals to ensure that the size and wall thickness meet the requirements. The steel pipes after inspection will be threaded by a thread rolling machine. 

Steel pipe thread rolling Steel pipe thread rolling Steel pipe thread rolling 

③ Use laser cutting machine to cut Base Jack according to the size of the design drawing

Cutting and grinding according to the base jack size will make the steel pipe smoother.

cut base jack cut base jack cut base jack

④ Perform external chamfering on Base Jack to make the cut smoother and install nuts more convenient

base jack base jack base jack

⑤ Use laser cutting machine to cut Base Plate according to the size requirements and shape on the design drawing

We will use a laser cutting machine or a shearing machine to cut the steel plate, and punch and stamp the base plate according to the design requirements.

cut Base Plate cut Base Plate


⑥ Stamp Base Plate

Stamp Base Plate Stamp Base Plate Stamp Base Plate

⑦ Place Base Jack and bottom plate on automatic welding equipment for welding

We will weld the processed steel pipe and base plate. We use machine welding, which can greatly improve production efficiency and reduce production costs.

base jack welding base jack welding base jack welding

⑧ The welded equipment is surface treated as required, including electro-galvanizing, hot-dip galvanizing, spraying and painting

After welding, the weld will be inspected, and the screw jack that meets the requirements will be surface treated, such as galvanizing, spraying, painting, etc.

galvanized base jack galvanized base jack galvanized base jack

⑨ Install nuts and destroy teeth

After the surface treatment is completed, install the nut into the screw jack to adjust the height of the screw jack. After the nut is installed, the screw jack needs to be destroyed to prevent the nut from rotating and falling out of the screw jack.

base jack install base jack destroy teeth base jack destroy teeth

⑩ Final quality inspection

base jack inspection 

⑪ Packing and stacking

Base Jack Packaging Base Jack Packaging Base Jack Packaging

⑫ Loading and shipping

base jack shipping base jack shipping base jack shipping

In addition to producing Base Screw Jack, EK Scaffolding also provides other building materials. Our Base Jack, Steel Prop and Scaffolding Gate are very advantageous in quality and price. If you need them, we are always here.


Get in Touch

86-25-5712 3616

0086-18606192990

kevin@eksca.com

Sign InRegister

Scaffolding Manufacturer

EK Scaffolding

Contact Us

Copyright © 2016 - 2022 EK Metalwork Co.,Ltd. All rights reserved.