| Availability: | |
|---|---|
| Quantity: | |
Cuplock System Vertical
EK
730890000
48.3x3.2mm
Q235
Hot-Dip Galvanized
depends on the length
Cuplock standard is also called cuplock verticals. It is steel upright in the cuplock scaffolding system. In construction, the cuplock standard transfers the entire weight from the structure to the ground. In manufacturing, the cuplock standards are manufactured from 3.2mm or 4.0mm thickness scaffolding pipes.
Cuplock scaffolding standard verticals are typically made of high-strength steel tubing with an outer diameter of 48.3 mm and a wall thickness of 3.2 mm or 4 mm, ranging in length from 0.5 m to 3 m. A pair of cup-shaped connectors are welded to this tubing every 500 mm as a locking device. Uprights can be connected using fasteners such as pipe clamps and internal clamps. Alternatively, a 150 mm pin can be fixed to the top of the upright for upward connection. Cuplock scaffolding standard, also known as cuplock scaffolding vertical, is an important component of the cuplock scaffolding system. It connects horizontal crossbars and uprights via cup-shaped locking devices, securing them without additional fittings.
Main Components of a Cuplock scaffolding Vertical:
Steel Tube: Made of high-quality galvanized steel, length 0.5 m to 3 m
Locking Device: Cup-shaped, consisting of two cup-shaped structures: a fixed cup, directly welded to the steel tube, and a sliding cup for locking the crossbar.
Cuplock scaffolding vertical specifications
Material: High-strength steel, Q235, Q345
Pipe diameter: 48.3 mm (outer diameter)
Wall thickness: 3.2 mm or 4.0 mm
Length: 500 mm, 1000 mm, 1500 mm, 2000 mm, 2500 mm, 3000 mm, etc.
Cuplock spacing: Cuplocks are welded to the cuplock scaffolding vertical at 500 mm intervals.
Weight: Weight varies depending on length and wall thickness.
Surface treatment: Electro-galvanized or hot-dip galvanized, painted or powder-coated.
Packaging: Shelf pallets and strapping available.
Delivery time: 30 days
Capacity: 1000 tons per month
Cuplock scaffolding vertical key features and standards
Locking mechanism: Horizontal components are locked in place via a unique cup-shaped joint, achieving a secure and reliable connection through hammering.
Production standards: BS1139, OSHA, ANSI, and CSA standards.
Component Specifications: Constructed from high-quality steel, all components undergo strength and safety testing.
Material Quality: Cuplock Vertical components are tested according to standards such as BS1139, and the strength of the cup joints is measured before mass production.
Surface Treatment: Cuplock Vertical components undergo galvanizing or painting for corrosion and rust prevention.
Product Description


1) Cuplock Scaffolding Main Parts

2) Cuplok Scaffolding Sytem Standard with Spiglot

Code | Length | Weight | ||
EK-CLS001 | 0.5 M | 1’8” | 3.40 KG | 7.50 LBS |
EK-CLS002 | 1.0 M | 3’3” | 6.10 KG | 13.45 LBS |
EK-CLS003 | 1.5 M | 4’11” | 8.72 KG | 19.22 LBS |
EK-CLS004 | 2.0 M | 6’6” | 11.34 KG | 25.00 LBS |
EK-CLS005 | 2.5 M | 8’2” | 13.95 KG | 30.75 LBS |
EK-CLS006 | 3.0 M | 9’10” | 16.57 KG | 36.53 LBS |
3) Scaflok Cuplock Scaffolding Standard without spigot

Code | Length | Weight | ||
EK-CLS007 | 0.8 M | 2’7” | 4.56 KG | 10.05 LBS |
EK-CLS008 | 1.3 M | 4’3” | 7.18 KG | 15.83 LBS |
EK-CLS009 | 1.8 M | 6’ | 9.79 KG | 21.58 LBS |
EK-CLS010 | 2.3 M | 7’6” | 12.41 KG | 27.36 LBS |
Loading

Cuplock standard is also called cuplock verticals. It is steel upright in the cuplock scaffolding system. In construction, the cuplock standard transfers the entire weight from the structure to the ground. In manufacturing, the cuplock standards are manufactured from 3.2mm or 4.0mm thickness scaffolding pipes.
Cuplock scaffolding standard verticals are typically made of high-strength steel tubing with an outer diameter of 48.3 mm and a wall thickness of 3.2 mm or 4 mm, ranging in length from 0.5 m to 3 m. A pair of cup-shaped connectors are welded to this tubing every 500 mm as a locking device. Uprights can be connected using fasteners such as pipe clamps and internal clamps. Alternatively, a 150 mm pin can be fixed to the top of the upright for upward connection. Cuplock scaffolding standard, also known as cuplock scaffolding vertical, is an important component of the cuplock scaffolding system. It connects horizontal crossbars and uprights via cup-shaped locking devices, securing them without additional fittings.
Main Components of a Cuplock scaffolding Vertical:
Steel Tube: Made of high-quality galvanized steel, length 0.5 m to 3 m
Locking Device: Cup-shaped, consisting of two cup-shaped structures: a fixed cup, directly welded to the steel tube, and a sliding cup for locking the crossbar.
Cuplock scaffolding vertical specifications
Material: High-strength steel, Q235, Q345
Pipe diameter: 48.3 mm (outer diameter)
Wall thickness: 3.2 mm or 4.0 mm
Length: 500 mm, 1000 mm, 1500 mm, 2000 mm, 2500 mm, 3000 mm, etc.
Cuplock spacing: Cuplocks are welded to the cuplock scaffolding vertical at 500 mm intervals.
Weight: Weight varies depending on length and wall thickness.
Surface treatment: Electro-galvanized or hot-dip galvanized, painted or powder-coated.
Packaging: Shelf pallets and strapping available.
Delivery time: 30 days
Capacity: 1000 tons per month
Cuplock scaffolding vertical key features and standards
Locking mechanism: Horizontal components are locked in place via a unique cup-shaped joint, achieving a secure and reliable connection through hammering.
Production standards: BS1139, OSHA, ANSI, and CSA standards.
Component Specifications: Constructed from high-quality steel, all components undergo strength and safety testing.
Material Quality: Cuplock Vertical components are tested according to standards such as BS1139, and the strength of the cup joints is measured before mass production.
Surface Treatment: Cuplock Vertical components undergo galvanizing or painting for corrosion and rust prevention.
Product Description


1) Cuplock Scaffolding Main Parts

2) Cuplok Scaffolding Sytem Standard with Spiglot

Code | Length | Weight | ||
EK-CLS001 | 0.5 M | 1’8” | 3.40 KG | 7.50 LBS |
EK-CLS002 | 1.0 M | 3’3” | 6.10 KG | 13.45 LBS |
EK-CLS003 | 1.5 M | 4’11” | 8.72 KG | 19.22 LBS |
EK-CLS004 | 2.0 M | 6’6” | 11.34 KG | 25.00 LBS |
EK-CLS005 | 2.5 M | 8’2” | 13.95 KG | 30.75 LBS |
EK-CLS006 | 3.0 M | 9’10” | 16.57 KG | 36.53 LBS |
3) Scaflok Cuplock Scaffolding Standard without spigot

Code | Length | Weight | ||
EK-CLS007 | 0.8 M | 2’7” | 4.56 KG | 10.05 LBS |
EK-CLS008 | 1.3 M | 4’3” | 7.18 KG | 15.83 LBS |
EK-CLS009 | 1.8 M | 6’ | 9.79 KG | 21.58 LBS |
EK-CLS010 | 2.3 M | 7’6” | 12.41 KG | 27.36 LBS |
Loading

Copyright © 2016 - 2022 EK Metalwork Co.,Ltd. All rights reserved.